Design, build, maintain, operate

Each stage ends with a written deliverable and a signature. You always know where the project stands and who is responsible.

Design and planning

  • Site survey and measurement
  • Lane and equipment layout
  • 2D and 3D drawings
  • MEP and structural coordination
  • Itemised budget and programme

Supply and import

  • Factory orders with the brands we represent
  • Certificates of origin and quality
  • Customs clearance and duties
  • Delivery to site on a checked route

Turnkey installation

  • Subfloor and machine platform
  • Acoustic and humidity control
  • Power, data and lighting
  • Installation and calibration
  • Commissioning and handover file

Maintenance and operation

  • Operator and mechanic training
  • Scheduled preventive maintenance
  • Spare parts stocked in Vietnam
  • Lane cleaning and conditioning
  • Pinsetter and scoring support
  • Operating support for new venues

Six steps from first visit to opening day

  1. Week 1

    Survey

    Clear length, width and height; floor flatness, load capacity and humidity. You learn at once which systems fit.

  2. Week 1–2

    Layout and drawings

    Lane layout, MEP drawings and a budget split into equipment, duties, freight and installation.

  3. Week 2

    Contract and order

    Configuration, warranty and programme are fixed. The deposit is paid and the factory order opened.

  4. Week 3–6

    Import and delivery

    Production, origin documents, customs clearance and transport along a route checked in advance.

  5. Week 6–9

    Installation

    Subfloor, raised platform, acoustics, power and data, then the machines, installed under brand supervision.

  6. Week 9–10

    Handover

    Test runs, calibration, operator training, documents, spare parts and a maintenance calendar.

Typical programme. Factory lead time is confirmed in every proposal.

Three ways to keep a venue running

On call

Repairs and parts when you ask, for venues with their own mechanic.

Scheduled

Preventive visits on a fixed calendar, with a written report after each one.

Managed

We staff the technical side: daily lane care, pinsetter upkeep and parts, for a monthly fee.

Send three measurements. Get three things back.

Length, width and height of the room are enough to start. Within 48 working hours you receive a lane layout drawn to your room, a price range split into equipment, duties, freight and installation, and a week-by-week programme counted back from your opening date.

No fee, no obligation. For unannounced projects we sign an NDA first.