Design, build, maintain, operate
Each stage ends with a written deliverable and a signature. You always know where the project stands and who is responsible.
Design and planning
- Site survey and measurement
- Lane and equipment layout
- 2D and 3D drawings
- MEP and structural coordination
- Itemised budget and programme
Supply and import
- Factory orders with the brands we represent
- Certificates of origin and quality
- Customs clearance and duties
- Delivery to site on a checked route
Turnkey installation
- Subfloor and machine platform
- Acoustic and humidity control
- Power, data and lighting
- Installation and calibration
- Commissioning and handover file
Maintenance and operation
- Operator and mechanic training
- Scheduled preventive maintenance
- Spare parts stocked in Vietnam
- Lane cleaning and conditioning
- Pinsetter and scoring support
- Operating support for new venues
Six steps from first visit to opening day
-
Week 1
Survey
Clear length, width and height; floor flatness, load capacity and humidity. You learn at once which systems fit.
-
Week 1–2
Layout and drawings
Lane layout, MEP drawings and a budget split into equipment, duties, freight and installation.
-
Week 2
Contract and order
Configuration, warranty and programme are fixed. The deposit is paid and the factory order opened.
-
Week 3–6
Import and delivery
Production, origin documents, customs clearance and transport along a route checked in advance.
-
Week 6–9
Installation
Subfloor, raised platform, acoustics, power and data, then the machines, installed under brand supervision.
-
Week 9–10
Handover
Test runs, calibration, operator training, documents, spare parts and a maintenance calendar.
Typical programme. Factory lead time is confirmed in every proposal.
Three ways to keep a venue running
On call
Repairs and parts when you ask, for venues with their own mechanic.
Scheduled
Preventive visits on a fixed calendar, with a written report after each one.
Managed
We staff the technical side: daily lane care, pinsetter upkeep and parts, for a monthly fee.
Send three measurements. Get three things back.
Length, width and height of the room are enough to start. Within 48 working hours you receive a lane layout drawn to your room, a price range split into equipment, duties, freight and installation, and a week-by-week programme counted back from your opening date.
No fee, no obligation. For unannounced projects we sign an NDA first.